8.23.2008

Bye Bye West Wing

This is after we ripped off the west side of the house and put all the scraps in the dumpster. Chuck and Jeremy accomplished all of this in about 4 hours, I think. Once, we get the inside finished, we'll come back to this and rebuild these three rooms: second bath, laundry room/office, and small second bedroom/cat room. :)

Installing the New Tub

...and relaxing after all that hard work.


Phase 2

I don't know if it can technically be called "phase 2" if you're working on it during phase 1, but we had to take advantage of having the back hoe. So, Chuck and I (mostly Chuck), removed the tin roof from the right side of the house. Then Chuck took the back hoe and pretty much ripped this side off the main house.


After Grading

Here is a good shot of the house after we graded around it with the back hoe. We still have to redo that back room of the house and work on some other small details, but we're getting closer!