This is one of my favorite pictures so far. :)4.03.2008
King of the Hill

Okay, by this point, JB leveled the ground and dug the L-shaped "ditch" for the footers of the addition. Then he laid in rebar, sump-pumped tons of water from one of the 1,000 rainstorms we've had, and then we had a concrete truck come out and pour the concrete. After it dried, we laid the blocks that you see here. It's all much easier said than done!
JB on the Back Hoe
Subscribe to:
Posts (Atom)
